ֱ

Method Statement For Cutting Concrete Slab Template for Indonesia

A comprehensive technical document that outlines the methodology, safety procedures, and execution requirements for concrete slab cutting operations in Indonesia. This document ensures compliance with Indonesian construction safety regulations, including UU No. 1 Tahun 1970 and relevant SNI standards, while providing detailed step-by-step procedures for safe and efficient concrete cutting. It incorporates specific requirements for environmental protection, worker safety, and quality control measures as mandated by Indonesian law, along with risk assessment and mitigation strategies tailored to local construction practices.

Typically:
i
This cost is based on prices provided by
6 legal services in your market.
With ֱ:

£0

i
Generate and export your first
document completely free.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Get template free

Your data doesn't train Genie's AI

You keep IP ownership of your docs

4.6 / 5
4.6 / 5
4.8 / 5

What is a Method Statement For Cutting Concrete Slab?

The Method Statement For Cutting Concrete Slab is a critical operational document required for any construction or renovation project in Indonesia involving concrete cutting activities. This document is essential for ensuring compliance with Indonesian workplace safety regulations, particularly UU No. 1 Tahun 1970 and SNI construction standards. It should be prepared before commencing any concrete cutting operations and must detail specific methodologies, safety protocols, and environmental controls. The method statement serves as both a regulatory compliance document and a practical guide for workers, supervisors, and safety personnel, incorporating local building authority requirements and industry best practices. It is particularly important given Indonesia's specific environmental conditions and construction safety requirements, and must be updated to reflect any changes in local regulations or project conditions.

What sections should be included in a Method Statement For Cutting Concrete Slab?

1. 1. Project Information: Details of the project, location, client, and scope of concrete cutting work

2. 2. Purpose and Scope: Specific objectives of the concrete cutting operation and areas to be covered

3. 3. References: Applicable standards, codes, and regulations governing the work

4. 4. Responsibilities: Roles and responsibilities of all involved parties including supervisor, operators, and safety personnel

5. 5. Risk Assessment: Identification of hazards and control measures specific to concrete cutting operations

6. 6. Safety Requirements: Mandatory safety procedures, PPE requirements, and emergency protocols

7. 7. Equipment and Tools: List of required cutting equipment, tools, and safety devices with specifications

8. 8. Methodology: Step-by-step procedure for concrete cutting, including preparation, execution, and completion

9. 9. Environmental Controls: Dust suppression, waste management, and noise control measures

10. 10. Quality Control: Inspection procedures, acceptance criteria, and quality assurance measures

What sections are optional to include in a Method Statement For Cutting Concrete Slab?

1. Working at Heights: Required when cutting operations involve elevated work platforms or edge protection

2. Utility Protection: Needed when work is near electrical, plumbing, or other building services

3. Traffic Management: Required for projects involving work in or near vehicle or pedestrian traffic areas

4. Noise Management: Required for work in noise-sensitive areas or during restricted hours

5. Temporary Works: Needed when temporary supports or structures are required during cutting

6. Special Access Requirements: Required when work involves confined spaces or restricted access areas

What schedules should be included in a Method Statement For Cutting Concrete Slab?

1. Appendix A - Risk Assessment Matrix: Detailed risk assessment tables and control measures

2. Appendix B - Equipment Certificates: Copies of equipment calibration and inspection certificates

3. Appendix C - Operator Certifications: Copies of relevant operator licenses and training certificates

4. Appendix D - Site Layout Plan: Drawings showing work areas, access points, and safety zones

5. Appendix E - Emergency Response Plan: Emergency procedures and contact information

6. Appendix F - Inspection Checklists: Pre-start and completion inspection forms

7. Appendix G - Permits: Copies of relevant work permits and approvals

Authors

Alex Denne

Head of Growth (Open Source Law) @ ֱ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents

Jurisdiction

Indonesia

Publisher

ֱ

Document Type

Method Statement

Cost

Free to use

Find the exact document you need

Contractor Method Statement

A detailed work methodology and safety procedure document compliant with Indonesian construction regulations, outlining specific construction activities and their safe execution methods.

Download

Method Statement For Cutting Concrete Slab

A technical document outlining methodology and safety procedures for concrete slab cutting operations in compliance with Indonesian construction regulations.

Download

Method Statement For Column Formwork

An Indonesian-compliant technical document detailing procedures and safety requirements for column formwork installation in construction projects.

Download

Method Statement For Demolition Of Concrete Slab

A technical document compliant with Indonesian regulations that outlines the safe methodology for concrete slab demolition, including safety measures and environmental controls.

Download
See more related templates

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it