ֱ

Painting Risk Assessment And Method Statement Template for Indonesia

A comprehensive document required under Indonesian occupational safety regulations, particularly Law No. 1 of 1970 and Government Regulation No. 50 of 2012, that outlines the systematic approach to identifying, assessing, and controlling risks associated with painting operations. The document combines a detailed risk assessment with a step-by-step methodology for safe work execution, incorporating specific requirements for personal protective equipment, environmental protection measures, and emergency procedures in accordance with Indonesian safety standards and environmental regulations.

Typically:
i
This cost is based on prices provided by
6 legal services in your market.
With ֱ:

£0

i
Generate and export your first
document completely free.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Get template free

Your data doesn't train Genie's AI

You keep IP ownership of your docs

4.6 / 5
4.6 / 5
4.8 / 5

What is a Painting Risk Assessment And Method Statement?

The Painting Risk Assessment And Method Statement is a mandatory health and safety document required for painting operations in Indonesia, governed by Law No. 1 of 1970 on Occupational Safety and Government Regulation No. 50 of 2012 on Safety Management Systems. This document serves as both a risk management tool and a procedural guide, essential before commencing any painting works in commercial, industrial, or residential settings. It includes comprehensive hazard identification, risk evaluation, control measures, detailed work procedures, and emergency protocols. The document must be prepared in compliance with Indonesian regulations regarding workplace safety, environmental protection, and hazardous material handling, making it a crucial tool for ensuring worker safety and regulatory compliance in painting operations.

What sections should be included in a Painting Risk Assessment And Method Statement?

1. Project Information: Details of the project, location, client, and contractor information

2. Scope of Work: Detailed description of painting works to be undertaken, including areas, surfaces, and types of paint to be used

3. Risk Assessment: Identification and evaluation of potential hazards, risk levels, and control measures

4. Method Statement: Step-by-step procedure for carrying out the painting works safely

5. Personnel and Responsibilities: List of personnel involved, their roles, qualifications, and responsibilities

6. Equipment and Materials: Details of tools, equipment, and materials to be used, including PPE requirements

7. Safety Procedures: General safety protocols, including emergency procedures and first aid arrangements

8. Environmental Protection Measures: Procedures for protecting the environment and managing waste

9. Quality Control: Standards, inspection procedures, and acceptance criteria

What sections are optional to include in a Painting Risk Assessment And Method Statement?

1. Working at Heights Procedure: Required when painting involves working above ground level, including scaffold requirements and fall protection

2. Confined Space Entry: Needed when painting in enclosed or confined spaces with limited access

3. Hot Work Procedures: Required when painting involves or is near hot work activities

4. Weather Contingency Plan: Necessary for exterior painting projects affected by weather conditions

5. Traffic Management Plan: Required when painting work affects vehicle or pedestrian traffic

6. Noise Control Measures: Needed when painting operations may cause significant noise impact

7. Ventilation Requirements: Special requirements for ensuring adequate ventilation during painting

What schedules should be included in a Painting Risk Assessment And Method Statement?

1. Schedule A - Risk Assessment Matrix: Detailed risk assessment tables and scoring methodology

2. Schedule B - Safety Data Sheets: SDS for all paints and chemicals to be used

3. Schedule C - Equipment Inspection Checklists: Forms for regular inspection of equipment and PPE

4. Schedule D - Emergency Contact Information: List of emergency contacts and procedures

5. Schedule E - Training Records: Certificates and training records of personnel

6. Schedule F - Site Layout Plans: Drawing showing work areas, access points, and emergency routes

7. Schedule G - Daily Inspection Forms: Templates for daily safety and quality inspections

8. Schedule H - Incident Reporting Forms: Templates for reporting accidents or near-misses

Authors

Alex Denne

Head of Growth (Open Source Law) @ ֱ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents

Jurisdiction

Indonesia

Publisher

ֱ

Cost

Free to use

Find the exact document you need

On Site Risk Assessment

Professional on-site risk assessment agreement compliant with Indonesian safety regulations and workplace safety laws.

Download

Money Laundering Risk Assessment For Solicitors

An Indonesian law-compliant risk assessment framework for identifying and managing money laundering risks in legal practices.

Download

Kitchen Equipment Risk Assessment

A risk assessment document for kitchen equipment operations, ensuring compliance with Indonesian safety regulations and establishing safety protocols for commercial kitchen environments.

Download

E Authentication Risk Assessment

A technical assessment document evaluating electronic authentication risks and compliance requirements under Indonesian law.

Download

Crm Risk Assessment Matrix

An Indonesian-compliant risk assessment framework for evaluating and managing customer-related risks in financial institutions.

Download

Company Risk Assessment

A comprehensive risk assessment document compliant with Indonesian regulatory requirements, analyzing organizational risks and providing mitigation strategies.

Download

Equipment Criticality Assessment Matrix

A structured framework for evaluating equipment criticality and risk assessment in accordance with Indonesian safety regulations and SMK3 requirements.

Download

Risk Assessment Summary

A structured evaluation of organizational risks and mitigation strategies, compliant with Indonesian risk management regulations and safety standards.

Download

Young Worker Risk Assessment

An Indonesian law-compliant risk assessment document for evaluating and protecting young workers (ages 15-17) in the workplace.

Download

OHS Risk Assessment

An Indonesian regulatory-compliant workplace safety document that systematically assesses and addresses occupational hazards and risks under Government Regulation No. 50 of 2012 on SMK3.

Download

Residential Fire Risk Assessment

A technical assessment document evaluating fire safety risks in residential properties under Indonesian building safety regulations.

Download

Jsa Risk Assessment

A structured workplace safety assessment document that analyzes job-specific risks and control measures, complying with Indonesian safety regulations and SMK3 requirements.

Download

Risk Assessment Control Form

An Indonesian regulatory-compliant document for systematic workplace hazard identification, risk assessment, and control measure implementation.

Download

Confined Space Hazard Assessment

An Indonesian regulatory-compliant assessment document for identifying and controlling confined space hazards in accordance with national safety laws.

Download

Museum Risk Assessment

A comprehensive museum risk assessment document compliant with Indonesian cultural heritage and safety regulations, evaluating collection and public safety risks with mitigation recommendations.

Download

Fraud Risk Assessment For Banks

A regulatory-compliant fraud risk assessment document for Indonesian banking institutions, aligned with OJK and Bank Indonesia requirements.

Download

Credit Union Risk Assessment

An Indonesian-compliant risk assessment framework for credit unions, incorporating OJK regulatory requirements and comprehensive risk evaluation guidelines.

Download

Safety Assessment Form

An Indonesian-compliant workplace safety assessment document for systematic hazard identification and risk control, aligned with local safety regulations.

Download

Liquidity Risk Assessment

A regulatory-compliant liquidity risk evaluation document for financial institutions operating in Indonesia, aligned with OJK and Bank Indonesia requirements.

Download

Information Security Risk Assessment Report

A detailed assessment of information security risks and mitigation recommendations, aligned with Indonesian data protection and cybersecurity regulations.

Download

Infection Control Risk Assessment Form For (Construction)

An Indonesian-compliant risk assessment form for managing infection control during healthcare facility construction projects.

Download

Warehouse Fire Risk Assessment

A fire risk assessment document for warehouse facilities in Indonesia, ensuring compliance with national safety regulations while evaluating and mitigating fire hazards.

Download

Abc Risk Assessment

An anti-bribery and corruption risk evaluation document aligned with Indonesian regulatory requirements, assessing organizational risks and providing mitigation recommendations.

Download

Risk Assessment Executive Summary

An executive-level summary of organizational risks and mitigation strategies, compliant with Indonesian regulatory requirements and risk management frameworks.

Download

Severity Risk Assessment Matrix

An Indonesian-compliant risk assessment matrix framework for evaluating and categorizing operational risks according to their severity and likelihood.

Download

Risk Assessment SOP

Standard Operating Procedure for conducting workplace risk assessments in compliance with Indonesian safety regulations and government requirements.

Download

Security Risk Assessment Report

A comprehensive security risk evaluation document compliant with Indonesian regulations, assessing organizational security threats, vulnerabilities, and providing mitigation recommendations.

Download

Risk Assessment Report Of A Company

A comprehensive risk assessment document analyzing company-wide risks and mitigation strategies, compliant with Indonesian regulatory requirements.

Download

Hot Works Risk Assessment

An Indonesian-compliant risk assessment document for managing safety in hot works operations, including welding, cutting, and related heat-generating activities.

Download

Hazard Risk Assessment

A structured evaluation of operational hazards and risks, compliant with Indonesian safety regulations, providing risk analysis and mitigation recommendations.

Download

Cyber Security Risk Assessment Matrix

A structured cybersecurity risk assessment framework compliant with Indonesian regulations for identifying and evaluating organizational cyber risks.

Download

Building Risk Assessment

An Indonesian law-compliant assessment document evaluating building-related risks, safety compliance, and recommended mitigation measures under Law No. 28 of 2002 and related regulations.

Download

Personal Training Risk Assessment

An Indonesian-compliant risk assessment document for personal training services, outlining safety protocols and risk mitigation strategies in accordance with local regulations.

Download

Risk Assessment Document Software Development

A comprehensive software development risk assessment document compliant with Indonesian regulations, focusing on technical, operational, and security risk management.

Download

Participant Risk Assessment

An Indonesian-compliant risk assessment document analyzing participant risk profiles across multiple dimensions, meeting local regulatory requirements.

Download

Machine Guarding Risk Assessment

A technical assessment of machinery safety risks and guarding requirements compliant with Indonesian workplace safety regulations, providing recommendations for safety improvements.

Download

Latex Risk Assessment

An Indonesian-compliant workplace safety document assessing latex-related risks and establishing control measures under Law No. 1 of 1970.

Download

IT Security Assessment Report

A technical report detailing IT security assessment findings and recommendations, aligned with Indonesian cybersecurity regulations and standards.

Download

Application Security Risk Assessment

An Indonesian law-compliant agreement for conducting Application Security Risk Assessment, establishing assessment parameters and compliance requirements.

Download

Indoor Event Risk Assessment

An Indonesian-compliant risk assessment template for indoor events, incorporating national safety regulations and local building codes.

Download
See more related templates

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it