1. Document Control Information: Contains document reference number, revision history, and approval status
2. Project Details: Specific information about the project, location, dates, and responsible parties
3. Scope of Work: Detailed description of scaffolding work to be undertaken
4. Risk Assessment: Systematic evaluation of all potential hazards, their likelihood, and severity
5. Control Measures: Detailed preventive and protective measures for identified risks
6. Method Statement: Step-by-step procedure for scaffold erection, use, and dismantling
7. Personnel Requirements: Qualifications, training requirements, and responsibilities of all involved personnel
8. Equipment and Materials: List of required scaffolding components, tools, and safety equipment
9. Safety Procedures: General safety rules and specific safety requirements for scaffold work
10. Emergency Procedures: Response procedures for potential emergency situations
11. Monitoring and Supervision: Details of inspection regimes and supervision requirements
1. Environmental Considerations: Required when work involves specific environmental risks or concerns
2. Special Access Requirements: Needed when complex access arrangements or restrictions exist
3. Interface with Other Activities: Include when scaffold work overlaps with other construction activities
4. Weather Contingency Plans: Required for external scaffolding in areas with severe weather conditions
5. Public Protection Measures: Necessary when scaffolding is erected in public areas
6. Temporary Works Design: Required for complex scaffold structures requiring engineering design
7. Local Authority Requirements: Include when specific local regulations or permits apply
1. Schedule A - Risk Assessment Matrix: Detailed risk evaluation matrices and scoring systems
2. Schedule B - Inspection Checklist: Daily and weekly scaffold inspection forms
3. Schedule C - Training Records: Copies of relevant training certificates and competency records
4. Schedule D - Equipment Specifications: Technical specifications of scaffold components and safety equipment
5. Schedule E - Site Layout Plans: Drawings showing scaffold locations and access routes
6. Schedule F - Emergency Contact Details: List of emergency contacts and response procedures
7. Appendix 1 - Scaffold Tags System: Examples and procedures for scaffold tagging system
8. Appendix 2 - Toolbox Talk Contents: Safety briefing materials for daily team discussions
9. Appendix 3 - Relevant Legislation: Copies of applicable regulations and standards
Find the exact document you need
On Site Risk Assessment
Professional on-site risk assessment agreement compliant with Indonesian safety regulations and workplace safety laws.
Money Laundering Risk Assessment For Solicitors
An Indonesian law-compliant risk assessment framework for identifying and managing money laundering risks in legal practices.
Kitchen Equipment Risk Assessment
A risk assessment document for kitchen equipment operations, ensuring compliance with Indonesian safety regulations and establishing safety protocols for commercial kitchen environments.
E Authentication Risk Assessment
A technical assessment document evaluating electronic authentication risks and compliance requirements under Indonesian law.
Crm Risk Assessment Matrix
An Indonesian-compliant risk assessment framework for evaluating and managing customer-related risks in financial institutions.
Company Risk Assessment
A comprehensive risk assessment document compliant with Indonesian regulatory requirements, analyzing organizational risks and providing mitigation strategies.
Equipment Criticality Assessment Matrix
A structured framework for evaluating equipment criticality and risk assessment in accordance with Indonesian safety regulations and SMK3 requirements.
Risk Assessment Summary
A structured evaluation of organizational risks and mitigation strategies, compliant with Indonesian risk management regulations and safety standards.
Young Worker Risk Assessment
An Indonesian law-compliant risk assessment document for evaluating and protecting young workers (ages 15-17) in the workplace.
OHS Risk Assessment
An Indonesian regulatory-compliant workplace safety document that systematically assesses and addresses occupational hazards and risks under Government Regulation No. 50 of 2012 on SMK3.
Residential Fire Risk Assessment
A technical assessment document evaluating fire safety risks in residential properties under Indonesian building safety regulations.
Jsa Risk Assessment
A structured workplace safety assessment document that analyzes job-specific risks and control measures, complying with Indonesian safety regulations and SMK3 requirements.
Risk Assessment Control Form
An Indonesian regulatory-compliant document for systematic workplace hazard identification, risk assessment, and control measure implementation.
Confined Space Hazard Assessment
An Indonesian regulatory-compliant assessment document for identifying and controlling confined space hazards in accordance with national safety laws.
Museum Risk Assessment
A comprehensive museum risk assessment document compliant with Indonesian cultural heritage and safety regulations, evaluating collection and public safety risks with mitigation recommendations.
Fraud Risk Assessment For Banks
A regulatory-compliant fraud risk assessment document for Indonesian banking institutions, aligned with OJK and Bank Indonesia requirements.
Credit Union Risk Assessment
An Indonesian-compliant risk assessment framework for credit unions, incorporating OJK regulatory requirements and comprehensive risk evaluation guidelines.
Safety Assessment Form
An Indonesian-compliant workplace safety assessment document for systematic hazard identification and risk control, aligned with local safety regulations.
Liquidity Risk Assessment
A regulatory-compliant liquidity risk evaluation document for financial institutions operating in Indonesia, aligned with OJK and Bank Indonesia requirements.
Information Security Risk Assessment Report
A detailed assessment of information security risks and mitigation recommendations, aligned with Indonesian data protection and cybersecurity regulations.
Infection Control Risk Assessment Form For (Construction)
An Indonesian-compliant risk assessment form for managing infection control during healthcare facility construction projects.
Warehouse Fire Risk Assessment
A fire risk assessment document for warehouse facilities in Indonesia, ensuring compliance with national safety regulations while evaluating and mitigating fire hazards.
Abc Risk Assessment
An anti-bribery and corruption risk evaluation document aligned with Indonesian regulatory requirements, assessing organizational risks and providing mitigation recommendations.
Risk Assessment Executive Summary
An executive-level summary of organizational risks and mitigation strategies, compliant with Indonesian regulatory requirements and risk management frameworks.
Severity Risk Assessment Matrix
An Indonesian-compliant risk assessment matrix framework for evaluating and categorizing operational risks according to their severity and likelihood.
Risk Assessment SOP
Standard Operating Procedure for conducting workplace risk assessments in compliance with Indonesian safety regulations and government requirements.
Security Risk Assessment Report
A comprehensive security risk evaluation document compliant with Indonesian regulations, assessing organizational security threats, vulnerabilities, and providing mitigation recommendations.
Risk Assessment Report Of A Company
A comprehensive risk assessment document analyzing company-wide risks and mitigation strategies, compliant with Indonesian regulatory requirements.
Hot Works Risk Assessment
An Indonesian-compliant risk assessment document for managing safety in hot works operations, including welding, cutting, and related heat-generating activities.
Hazard Risk Assessment
A structured evaluation of operational hazards and risks, compliant with Indonesian safety regulations, providing risk analysis and mitigation recommendations.
Cyber Security Risk Assessment Matrix
A structured cybersecurity risk assessment framework compliant with Indonesian regulations for identifying and evaluating organizational cyber risks.
Building Risk Assessment
An Indonesian law-compliant assessment document evaluating building-related risks, safety compliance, and recommended mitigation measures under Law No. 28 of 2002 and related regulations.
Personal Training Risk Assessment
An Indonesian-compliant risk assessment document for personal training services, outlining safety protocols and risk mitigation strategies in accordance with local regulations.
Risk Assessment Document Software Development
A comprehensive software development risk assessment document compliant with Indonesian regulations, focusing on technical, operational, and security risk management.
Participant Risk Assessment
An Indonesian-compliant risk assessment document analyzing participant risk profiles across multiple dimensions, meeting local regulatory requirements.
Machine Guarding Risk Assessment
A technical assessment of machinery safety risks and guarding requirements compliant with Indonesian workplace safety regulations, providing recommendations for safety improvements.
Latex Risk Assessment
An Indonesian-compliant workplace safety document assessing latex-related risks and establishing control measures under Law No. 1 of 1970.
IT Security Assessment Report
A technical report detailing IT security assessment findings and recommendations, aligned with Indonesian cybersecurity regulations and standards.
Application Security Risk Assessment
An Indonesian law-compliant agreement for conducting Application Security Risk Assessment, establishing assessment parameters and compliance requirements.
Indoor Event Risk Assessment
An Indonesian-compliant risk assessment template for indoor events, incorporating national safety regulations and local building codes.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it