ֱ

Site Specific Risk Assessment And Method Statement Template for India

A comprehensive document mandated under Indian health and safety regulations that combines a detailed risk assessment with a methodical work procedure statement. It identifies potential hazards, evaluates associated risks, and establishes control measures specific to a particular work site or project. The document ensures compliance with Indian safety standards, including the Occupational Safety, Health and Working Conditions Code, 2020, and relevant construction safety regulations. It serves as both a planning tool and a legal document, demonstrating due diligence in safety management and providing a framework for safe work execution.

Typically:
₹8658
i
This cost is based on prices provided by
6 legal services in your market.
With ֱ:

₹0

i
Generate and export your first
document completely free.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Get template free

Your data doesn't train Genie's AI

You keep IP ownership of your docs

4.6 / 5
4.6 / 5
4.8 / 5

What is a Site Specific Risk Assessment And Method Statement?

The Site Specific Risk Assessment And Method Statement (RAMS) is a crucial document required under Indian health and safety legislation, particularly the Occupational Safety, Health and Working Conditions Code, 2020, and various construction safety regulations. It is mandatory for projects involving significant safety risks or complex work procedures, serving as both a risk management tool and a legal compliance document. The RAMS must be prepared before work commences and requires regular updates as site conditions or work methods change. It combines systematic hazard identification and risk assessment with detailed work procedures, control measures, and emergency responses. The document is particularly important in the Indian context, where construction and industrial activities must balance rapid development with worker safety and regulatory compliance.

What sections should be included in a Site Specific Risk Assessment And Method Statement?

1. Document Control Information: Project details, document reference numbers, revision history, and approval status

2. Project Information: Site location, project scope, duration, and key contacts

3. Scope of Works: Detailed description of the work activities covered by this RAMS

4. Personnel and Responsibilities: List of all personnel involved, their roles, responsibilities, and required competencies

5. Risk Assessment Methodology: Explanation of risk assessment approach, scoring system, and risk matrix used

6. Hazard Identification and Risk Assessment: Detailed analysis of all potential hazards and their associated risks, including control measures

7. Method Statement: Step-by-step description of how the work will be carried out safely

8. Equipment and Materials: List of all equipment, tools, and materials to be used, including safety specifications

9. Personal Protective Equipment (PPE): Detailed requirements for PPE for different activities

10. Emergency Procedures: Emergency response plans, first aid arrangements, and emergency contact information

11. Environmental Protection Measures: Controls to protect the environment during work activities

12. Communication and Reporting: Communication protocols, reporting procedures, and documentation requirements

What sections are optional to include in a Site Specific Risk Assessment And Method Statement?

1. Permit to Work Requirements: Details of any required work permits, used when working in high-risk or controlled areas

2. Specialized Training Requirements: Additional training needs, included when work requires specific certifications or skills

3. Traffic Management Plan: Required when work affects vehicle or pedestrian traffic flow

4. Noise and Vibration Control: Included when work involves significant noise or vibration impacts

5. Working at Height Procedures: Detailed procedures required when work involves activities at height

6. Confined Space Entry Procedures: Required when work involves entering confined spaces

7. Lifting Operations: Included when work involves crane or mechanical lifting operations

8. Hot Work Procedures: Required when work involves welding, cutting, or other hot work

9. Temporary Works Assessment: Included when temporary structures or supports are required

What schedules should be included in a Site Specific Risk Assessment And Method Statement?

1. Risk Assessment Matrix: Detailed risk assessment scoring matrix and methodology

2. Site Layout Plans: Maps and drawings showing work areas, access points, and safety features

3. Equipment Inspection Checklists: Forms for equipment and tool inspections

4. PPE Inspection Forms: Checklists for PPE inspection and maintenance

5. Emergency Contact List: Comprehensive list of emergency contacts and procedures

6. Training Records: Copies of relevant training certificates and competency records

7. Method Statement Briefing Record: Form to record worker briefings on the method statement

8. Daily Activity Briefing Template: Template for daily safety briefings

9. Incident Report Forms: Templates for reporting accidents, incidents, and near misses

10. Safety Data Sheets: MSDS/SDS for any hazardous materials to be used

Authors

Alex Denne

Head of Growth (Open Source Law) @ ֱ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents

Jurisdiction

India

Publisher

ֱ

Cost

Free to use

Find the exact document you need

Low Voltage Directive Risk Assessment

A technical safety assessment for low voltage electrical equipment compliance under Indian regulations and standards.

Download

Liquidity Risk Assessment

A regulatory-compliant assessment of an organization's liquidity risk profile and management framework under Indian banking regulations and RBI guidelines.

Download

Mobile Catering Risk Assessment

A regulatory-compliant risk assessment document for mobile catering operations in India, covering food safety, operational hazards, and control measures.

Download

Medical Risk Assessment

An India-compliant medical risk assessment document for systematic evaluation and documentation of patient health risks, following national healthcare regulations and standards.

Download

Information Technology Risk Assessment

An agreement for IT Risk Assessment services governed by Indian law, outlining assessment scope, methodology, and compliance requirements.

Download

Information Security Risk Assessment Report

A comprehensive evaluation of an organization's information security risks and controls, compliant with Indian cybersecurity laws and regulations, providing detailed findings and recommendations for risk mitigation.

Download

Double Glazing Risk Assessment

An Indian-compliant risk assessment document for double glazing installation and maintenance, addressing safety requirements under Indian building and workplace safety regulations.

Download

Emergency Risk Assessment

A comprehensive emergency risk evaluation document compliant with Indian regulations, designed to identify and address potential emergency situations within organizations.

Download

Emergency Response Risk Assessment

A comprehensive emergency risk evaluation and response planning document compliant with Indian safety and disaster management regulations.

Download

Cyber Security Assessment

An Indian law-governed agreement for conducting professional cybersecurity assessment services, aligned with IT Act requirements and CERT-In guidelines.

Download

Coshh Risk Assessment Form

A hazardous substance risk assessment document aligned with Indian workplace safety regulations, based on COSHH principles for managing dangerous materials in the workplace.

Download

Continuous Risk Assessment

An India-compliant framework document establishing procedures and requirements for ongoing organizational risk assessment and management processes.

Download

Community Event Risk Assessment

An Indian-compliant risk assessment document for community events, addressing safety, emergency procedures, and regulatory requirements under Indian law.

Download

Client Risk Assessment Questionnaire

A regulatory-compliant questionnaire for assessing client risk profiles under Indian financial regulations, incorporating SEBI and RBI guidelines.

Download

Business Risk Assessment

A structured evaluation of business risks and mitigation strategies, compliant with Indian corporate governance requirements and regulatory framework.

Download

Broken Leg Risk Assessment

A workplace safety assessment document for identifying and mitigating leg injury risks, compliant with Indian safety regulations and workplace safety codes.

Download

Baseline Risk Assessment For Road (Construction)

A mandatory risk assessment document under Indian law that evaluates and addresses potential hazards and safety measures in road construction projects.

Download

Baseline Risk Assessment For Building (Construction)

A comprehensive construction risk assessment document aligned with Indian building safety regulations and construction laws, providing systematic hazard evaluation and mitigation strategies.

Download

Warehouse Fire Risk Assessment

A technical assessment document evaluating fire risks in warehouse facilities and recommending safety measures under Indian regulatory requirements.

Download

Abc Risk Assessment

A detailed evaluation of organization's anti-bribery and corruption risks under Indian law, including risk assessment findings and mitigation recommendations.

Download

Abac Risk Assessment

An ABAC system security and compliance risk assessment document aligned with Indian IT laws and international security standards.

Download

Vendor Security Assessment

A comprehensive vendor security assessment framework aligned with Indian IT laws and regulations, designed to evaluate vendor security controls and compliance status.

Download

Software Validation Risk Assessment

A technical-legal document for software validation risk assessment and mitigation in compliance with Indian regulations and IT industry standards.

Download

Remote Access Risk Assessment

A risk assessment document for evaluating remote access systems and infrastructure, aligned with Indian cybersecurity regulations and industry best practices.

Download

Risk Management Audit Report

A comprehensive evaluation of an organization's risk management framework and controls, compliant with Indian regulatory requirements and professional standards.

Download

Risk Assessment Science Experiment

A legal document under Indian jurisdiction that provides comprehensive risk assessment and safety protocols for scientific experiments, ensuring regulatory compliance and safety standards.

Download

Risk Assessment Methodology

A comprehensive risk assessment methodology document aligned with Indian regulatory requirements and industry best practices.

Download

Risk Assessment For Stall Holders

A regulatory-compliant risk assessment template for stall holders in India, covering operational safety and liability requirements under Indian law.

Download

Risk Assessment Executive Summary

A concise overview of organizational risk assessment findings and recommendations, compliant with Indian regulatory requirements and corporate governance standards.

Download

Risk Assessment Cyber Security

A comprehensive cybersecurity risk assessment document compliant with Indian regulations, evaluating organizational cyber risks and providing mitigation strategies.

Download

Outdoor Event Fire Risk Assessment

An Indian regulatory-compliant fire risk assessment template for outdoor events, covering hazard identification, control measures, and emergency procedures.

Download

Risk Maturity Assessment Report

An evaluation document used in India to assess and report on an organization's risk management maturity level, compliance, and improvement opportunities.

Download

Risk Evaluation Form

An Indian-compliant Risk Evaluation Form for systematic workplace hazard identification and risk assessment, aligned with national safety regulations.

Download

Risk Assessment Matrix Oil And Gas

A structured risk assessment framework for oil and gas operations in India, providing comprehensive guidelines for risk identification, evaluation, and management in compliance with national regulations.

Download

Quality Risk Assessment SOP

A Standard Operating Procedure for quality risk assessment processes compliant with Indian regulatory requirements and international quality standards.

Download

Risk Assessment SOP

A standardized procedure document for workplace risk assessment and management in compliance with Indian safety regulations and industry standards.

Download

Security Risk Assessment Report

A comprehensive security risk evaluation document that assesses vulnerabilities and provides risk mitigation recommendations, compliant with Indian IT and data protection regulations.

Download

Risk Assessment Questionnaire For Banks

A comprehensive risk assessment questionnaire for Indian banks, aligned with RBI regulations and banking standards, for evaluating multiple risk categories.

Download

Risk Assessment Letter

A formal risk evaluation document prepared under Indian law that identifies and analyzes potential risks while providing professional recommendations for risk mitigation.

Download

Risk Analysis Form

An India-compliant Risk Analysis Form for comprehensive risk assessment and management, aligned with local regulatory requirements.

Download
See more related templates

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it