Your data doesn't train Genie's AI
You keep IP ownership of your docs
1. Document Control: Details of document version, author, reviewers and revision history
2. Project Information: Basic details about the project, site location, and key stakeholders
3. Scope of Works: Detailed description of the aluminium formwork activities to be undertaken
4. Resources Required: List of personnel, equipment, and materials needed
5. Risk Assessment: Identification of hazards and control measures
6. Method Statement Procedure: Step-by-step procedure for formwork installation, use, and dismantling
7. Safety Requirements: PPE, training requirements, and safety measures
1. Environmental Considerations: Environmental impact measures and controls for projects near sensitive areas or when required by local authorities
2. Emergency Procedures: Specific emergency response procedures for high-risk operations or when required by client
3. Quality Control Measures: Specific quality checks and controls when required by client specifications
1. Risk Assessment Forms: Detailed risk assessment documentation
2. Equipment Inspection Checklists: Pre-use inspection forms for formwork components
3. Training Records: Certificates and competency records of workers
4. Technical Drawings: Formwork assembly and installation drawings
5. Manufacturer's Guidelines: Specific instructions from formwork manufacturer
Find the exact document you need
Cleaning Risk Assessment And Method Statement
A UK-compliant document outlining risk assessment and safe methods for cleaning operations in England and Wales.
Aluminium Formwork Method Statement
An England & Wales legal document formalizing collaborative relationships without forming a joint venture or merger.
Carpentry Risk Assessment And Method Statement
A legally required safety document under English and Welsh law that outlines risks and safe working methods for carpentry operations.
łŇ±đ˛Ôľ±±đ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; łŇ±đ˛Ôľ±±đ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it
