1. Project Information: Details of the project, location, dates, client details and key contacts including emergency numbers
2. Scope of Work: Detailed description of carpentry tasks to be undertaken, including specific activities and areas of work
3. Risk Assessment: Comprehensive identification of hazards, evaluation of risks, and detailed control measures for each identified risk
4. Method Statement: Step-by-step procedure for carrying out work safely, including sequence of operations and safety precautions
5. PPE Requirements: Detailed list of required personal protective equipment and when each item must be worn
1. Working at Height: Specific risk assessment and methodology for tasks involving work at elevation, including access equipment and fall protection measures
2. Noise Assessment: Evaluation of noise levels, exposure limits, and control measures for tasks involving power tools or noisy equipment
3. COSHH Assessment: Detailed assessment and control measures for tasks involving hazardous substances, including wood dust and chemical products
1. Site Plans: Layout drawings, work area details, and access/egress routes
2. Training Certificates: Copies of relevant qualifications, certifications, and training records for all workers
3. Equipment Inspection Records: Documentation of tool and equipment safety checks and maintenance records
4. Emergency Procedures: Site-specific emergency response plans, including first aid arrangements and evacuation procedures
Find the exact document you need
Cleaning Risk Assessment And Method Statement
A UK-compliant document outlining risk assessment and safe methods for cleaning operations in England and Wales.
Aluminium Formwork Method Statement
An England & Wales legal document formalizing collaborative relationships without forming a joint venture or merger.
Carpentry Risk Assessment And Method Statement
A legally required safety document under English and Welsh law that outlines risks and safe working methods for carpentry operations.
łŇ±đ˛Ôľ±±đ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; łŇ±đ˛Ôľ±±đ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it