1. Document Information: Project details, site information, and document control
2. Scope of Work: Detailed description of cleaning activities to be undertaken
3. Risk Assessment: Identification and evaluation of potential hazards
4. Control Measures: Specific actions to mitigate identified risks
5. Method Statement: Step-by-step procedure for carrying out work safely
6. PPE Requirements: Required personal protective equipment
1. Working at Height: Include when cleaning involves elevated work, such as window cleaning, high surfaces, or using ladders
2. Confined Spaces: Specific procedures for cleaning tanks, ducts, or enclosed spaces
3. Night Work Procedures: Additional safety measures for cleaning activities occurring outside normal hours
1. COSHH Assessment Sheets: Detailed information about chemical products used
2. Equipment Checklist: List of cleaning equipment and safety checks
3. Emergency Procedures: Emergency contact numbers and evacuation procedures
4. Training Records: Proof of relevant staff training and competencies
Find the exact document you need
Cleaning Risk Assessment And Method Statement
A UK-compliant document outlining risk assessment and safe methods for cleaning operations in England and Wales.
Aluminium Formwork Method Statement
An England & Wales legal document formalizing collaborative relationships without forming a joint venture or merger.
Carpentry Risk Assessment And Method Statement
A legally required safety document under English and Welsh law that outlines risks and safe working methods for carpentry operations.
łŇ±đ˛Ôľ±±đ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; łŇ±đ˛Ôľ±±đ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it